Roadworks report from 12 March 2010
To view the location of any of these works, please go to an
online map referral website and enter the postcode supplied
__________________________________________________________________
Location: Verona Rise, Darfield S73 9QW
Description: Temporary full length road closure in operation to aid the construction of new
Start Date: 29 June 2009
End Date: 31 December 2010
Remarks:
Promoter: Keepmoat Homes, Rick Long, telephone: 01302 347670
__________________________________________________________________
Location: Martins Road, Lundwood S71 5LX
Description: Temporary full length road closure in operation to enable the reconstruction of the
highway
Start Date: 31 August 2009
End Date: 17 May 2010
Remarks: Diversion route: Lang Avenue/Michael Road/Wike Road
Promoter: Strata Construction Limited, Andrew Rushton, telephone: 01302 324570
__________________________________________________________________
Location: Old Mill Lane, Barnsley S70 2LB
Description: Temporary double yellow lines in operation, opposite junctions between Longman
Road and Caxton Street, to enable visibility splays out of new entrance to Barnsley
Start Date: 28 September 2009
End Date: 01 March 2011
Remarks:
Promoter: Miller Construction, Jaime Harper, telephone: 07718 516555
__________________________________________________________________
Location: Leslie Road, Kendray S70 3JL
Description: Temporary road closure in operation to enable the health and safey of the public
whilst construction works are taking place. Extent of closure: from junction with
Raymond Road to junction of footpath leading to Hunningley Lane
Start Date: 31 October 2009
End Date: 01 April 2011
Remarks: Diversion route: Raymond Road/Reginald Road
Promoter: Keepmoat Homes, Shaun Tonge, telephone:07528 278070
__________________________________________________________________
Location: Ballfield Lane/Windsor Avenue, Kexbrough S75 5EJ
Description: Temporary double yellow lining in place for road safety reasons on both sides of the
carriageway. The extent of the restriction is as follows: Ballfield Lane - from new
roundabout to outside house number 84; Windsor Avenue - for 15 metres from
junction with Ballfield Lane
Start Date: 07 November 2009
End Date: 01 May 2010
Remarks:
Promoter: Laing O'Rourke, Allan Massey, telephone: 01226 388680
__________________________________________________________________
Location: Hollinberry Lane, Howbrook S35 7EL
Description: Temporary restriction to traffic - left turn only at T-junction onto A61 Westwood New
Road, to enable traffic safety onto the A61. From 7 November 2009, for approximately
20 weeks
Start Date: 07 November 2009
End Date: 31 March 2010
Remarks:
Promoter: Barnsley MBC Highways, Engineering and Waste, Martin Sunderland,
telephone:01226 772191
__________________________________________________________________
Location: Station Road/Stonyford Road/George Street/Snape Hill Road/Nanny Marr Road/Illsley
Road/Morrison Road/Barnsley Road/Upperwood Road, Darfield S73 8AF
Description: Temporary rolling road closure in operation for the Wombwell 5 Mile Road Race, from
10.00 am to 11.15 am
Start Date: 03 May 2010
End Date: 03 May 2010
Remarks:
Promoter: Wombwell Sporting Athletics Club, Jeanette Tomlins, telephone: 01226 754865
__________________________________________________________________
Location: Weetshaw Lane, Shafton S72 8AL
Description: Temporary road closure in operation for the construction of a roundabout as part of
the Cudworth and West Green By-Pass works. The road will be closed from 19
January 2010 for approximately 8 weeks, from the junction with Royston Road to the
junction with Pontefract Road
Start Date: 26 January 2010
End Date: 01 April 2010
Remarks: Diversion route: Royston Road/Pontefract Road
Promoter: VHE Construction Plc, Paul Cashon, telephone: 01226 714664
__________________________________________________________________
Location: Barnsley Road/Pontefract Road, Cudworth (A628) S72 8UU
Description: Temporary speed restriction in place (to 30 mph) to enable the construction of Burton
Road Roundabout, as part of the Cudworth and West Green By-Pass. For
approximately 26 weeks
Start Date: 04 January 2010
End Date: 05 July 2010
Remarks: The extent of the restriction is from outside number 80 Barnsley Road, Cudworth to
the junction with Abbots Road, Lundwood
Promoter: Barnsley MBC Highway Design, Michael Lewis, telephone: 01226 718016
__________________________________________________________________
Location: Burton Road, Cudworth S71 5RU
Description: Temporary road closure in operation for the construction of a roundabout, as part of
the Cudworth and West Green By-Pass. The closure is from 4 January 2010 for
approximately 8 weeks. The road is closed from the junction with Tumbling Lane to the
junction with Pontefract Road
Start Date: 04 January 2010
End Date: 12 March 2010
Remarks: Diversion route: Tumbling Lane/Pontefract Road
Promoter: VHE Construction Plc, Paul Cashon, telephone: 01226 714664
__________________________________________________________________
Location: Bank End Lane, High Hoyland S75 4AY
Description: Temporary 30 mph speed restriction and road closure in operation from 18 January
2010, for approximately three months. The extent of the speed restriction is from the
junction with High Hoyland Lane to just above the junction with Hollin House Lane. The
extent of the road closure is from the unmade path/bridleway to the junction with High
Hoyland Lane. The restriction is in force to enable repairs to a retaining wall
Start Date: 18 January 2010
End Date: 18 April 2010
Remarks: Diversion route: Upperfield Lane/Churchfield Lane/A637 Huddersfield Road/A636
Denby Dale Road/Wakefield Road
Promoter: Barnsley MBC Highways, Engineering and Waste Management, Keith Holdroyd,
telephone: 01226 772136
__________________________________________________________________
Location: Kendray Street, Barnsley S70 2TN
Description: Temporary road closure in operation to carry out essential maintenance works to the
railway level crossing. The restriction will be from 11.30 pm on 22 May 2010 to 8.00
am on 23 May 2010, and will be 20 metres either side of the railway level crossing
Start Date: 22 May 2010
End Date: 23 May 2010
Remarks: Diversion route: Eldon Street/Market Hill/Shambles Street/St Mary's Place/Church
Lane/Old Mill Lane/Harborough Hill Road/Pontefract Road
Promoter: Centurion Site Services, Noreen Coldwell, telephone: 01924 372957
__________________________________________________________________
Location: Royd Avenue, Millhouse Green S36 9NX
Description: Temporary road closure in operation to construct a sewer. This is from 1 March 2010
for approximately five weeks and is from outside number 63 to end
Start Date: 01 March 2010
End Date: 02 April 2010
Remarks:
Promoter: Bramall Construction, Martin Hodgkiss, telephone: 0161 876 6000
__________________________________________________________________
Location: Straight Lane, Goldlthorpe S63 9DW
Description: Temporary road closure and revoke one way system for approximately one day to
enable a structural examination of the railway bridge. The extent of the closure is for
20 metres either side of the railway bridge
Start Date: 19 April 2010
End Date: 19 April 2010
Remarks: Diversion route: High Street/Barnsley Road
Promoter: Centurion Site Services, Noreen Coldwell, telephone: 01924 372957
__________________________________________________________________
Location: Footpath linking Mount Vernon Road and Highstone Road, Worsbrough Common S70
4EJ
Description: Temporary full length footpath closure in operation to enable the construction of a
housing development
Start Date: 15 February 2010
End Date: 31 March 2010
Remarks: Diversion route: Highstone Road/Lockwood Avenue/Mount Vernon Road
Promoter: Bramall Construction Ltd, Andrew Jones, telephone: 01709 766061
__________________________________________________________________
Location: Church Street, Darton S75 5HE
Description: Temporary road closure in operation to enable the relaying of electric cables. This is
from 7, 14 and 21 March (for three consecutive Sundays). The extent of the closure is
from the junction with Mill Lane to opposite the bridge on Station Road
Start Date: 07 March 2010
End Date: 21 March 2010
Remarks: Diversion: Barnsley Road/Claycliffe Road/Wilthorpe Road/Huddersfield Road/Old Mill
Lane/Wakefield Road/Bar Lane/Blacker Road/Darton Lane
Promoter: Morrison Utility Services, Brian Greville, telephone: 0113 224 6804
__________________________________________________________________
Location: Saltersbrook, Goldthorpe S63 9AR
Description: Temporary road closure in operation to enable the safe construction of housing
development, at the rear of properties numbered 28 to 38
Start Date: 20 February 2010
End Date: 21 February 2011
Remarks:
Promoter: Southdale Homes Ltd, Kevin Knott, telephone: 01422 380090
__________________________________________________________________
Location: Churchfield Lane, Darton S75 5DH - M1 motorway bridge
Description: Footway - Ant Slip Coating
Start Date: 15 March 2010
End Date: 18 March 2010
Remarks: Portable off peak traffic signals (09:30-15:30)
Promoter: Aone+ - contact Felix Chongo tel 01924 225642 email felix.chongo@aone.uk.com
__________________________________________________________________
Location: Manchester Road, Dodworth (B6099) S75 3JJ
Description: Temporary road closure in operation to enable essential maintenance works to the
railway level crossing. The road will be closed for 20 metres either side of the railway
level crossing, from 10.30 pm to 6.00 am on the following dates: 15 to 17 May 2010,
17 to 18 May 2010, 18 to 19 May 2010, 19 to 20 May 2010, 22 to 24 May 2010, 29 to
31 May 2010
Start Date: 15 May 2010
End Date: 31 May 2010
Remarks: Diversion route: Whinby Road/North Road/Barnsley Road/Mitchelson Avenue
Promoter: Centurion Site Services, Noreen Coldwell, telephone: 01924 372957
__________________________________________________________________
Location: Windle Edge, Dunford Bridge S36 6TE
Description: Site access
Start Date: 15 February 2010
End Date: 15 November 2010
Remarks: Portable traffic signals during the daytime
Promoter: Balfour Beatty Construction - contact Augustine Matsvororo tel 07833 048265 email
augustine.matsvororo@bbcel.co.uk
__________________________________________________________________
Location: Fitzwilliam Street, Elsecar - outside Milton Hall to outside 196 King Street, Hoyland S74
9LJ
Description: Gas works
Start Date: 22 February 2010
End Date: 23 April 2010
Remarks: 24 hour portable traffic signals
Promoter: M1 Alliance - contact M Kitchen tel 07736 168766 fax 0114 232 7301
__________________________________________________________________
Location: Back Lane, Penistone S36 6BB
Description: Permanent road closure in operation for through traffic to allow for the building of the
Tesco Supermarket, from 1 March 2010
Start Date: 01 March 2010
End Date: 01 September 2010
Remarks:
Promoter: Barnsley MBC Highways and Engineering, Dave Butler, telephone: 01226 772038
__________________________________________________________________
Location: Barnburgh Lane, Goldthorpe DN5 7HN
Description: Temporary road closure in operation to excavate and install new electric cables
Start Date: 22 March 2010
End Date: 15 April 2010
Remarks: Extent of closure is from the railway bridge to Barnburgh Village
Promoter: Morrison Utility Services, telephone: 0113 203 8577
__________________________________________________________________
Location: Barnsley Road, Silkstone (A628) S75 4LU
Description: Temporary road closure in operation for carriageway resurfacing works. Diversion
route: westbound - A628 North Road/Barnsley Road/B6499 Barnsley Road/Dodworth
Green Road/Ben Bank Road/Knabbs Lane/Coates Lane/A629 Oxspring Lane/High
Lee Lane; eastbound - A629 High Lee Lane/Oxspring Lane/Jockey Road/Copster
Lane/Rag Lane/Halifax Road/Sheffield Road/A616 Stocksbrige By-Pass/A61 Sheffield
Road/Park Road/Upper Sheffield Road/A6133 Park Road/Broadway The extent of the
closure is from the junction with High Street, Silkstone to Hoylandswaine Roundabout
for approximately four weeks
Start Date: 22 March 2010
End Date: 19 April 2010
Remarks: The extent of the closure is from the junction with High Street, Silkstone to
Hoylandswaine Roundabout for approximately four weeks
Promoter: Barnsley MBC Highways and Engineering, Steve Sykes, telephone: 01226 772039
__________________________________________________________________
Location: Church Street/Station Road, Royston S71 4QU
Description: Temporary road closure in operation to enable carriageway resurfacing works. The
extent of the closure is from the junction with Vicarage Lane to the junction with Well
Hill Grove, for two consecutive Sundays: 21 and 28 March 2010
Start Date: 21 March 2010
End Date: 28 March 2010
Remarks: Diversion route: Church Hill/Park View/Midland Road/High Street/Summer Lane
Promoter: Barnsley MBC Highways and Engineering, Terri Fisher, telephone: 01226 774168
__________________________________________________________________
Location: Redbrook Road, Barnsley - junction with Harry Road S75 2NT
Description: Gas mains replace
Start Date: 10 March 2010
End Date: 19 March 2010
Remarks: 24 hour portable traffic signals
Promoter: National Gas M1 Gas Alliance - contact Chris Wade tel 07970 125636 fax 0114 232
7301 email chris.wade2@uk.ngrid.com
__________________________________________________________________
Location: Saunderson Road, Penistone - junction with Manchester Road S36 9DU
Description: Renew fire hydrant frame & cover
Start Date: 19 March 2010
End Date: 19 March 2010
Remarks: Portable stop and go boards during the working day
Promoter: Yorkshire Water H20 - contact Paul Garner tel 0845 124 2424 email
paul.garner@yorkshirewater.co.uk
__________________________________________________________________
Location: Pontefract Road, Cudworth S71 5RU
Description: Temporary road closure in operation to enable the construction of a roundabout. The
road will be closed from the junction with Barnsley Road to the junction of the new part
of Pontefract Road, from 8 May 2010 for approximately four weeks
Start Date: 08 May 2010
End Date: 04 June 2010
Remarks: Diversion route: traffic will be diverted onto the new part of Pontefract Road
Promoter: VHE Construction Plc, Paul Cashon, telephone: 01226 714664
__________________________________________________________________
Location: Tumbling Lane, Lundwood S71 5RU
Description: Temporary one way system in place to enable the construction of a roundabout.
Traffic will be directed from Pontefract Road towards Burton Road only, from 15 March
2010 for approximately 7 weeks
Start Date: 15 March 2010
End Date: 07 May 2010
Remarks:
Promoter: VHE Construction Plc, Paul Cashon, telephone: 01226 714664
__________________________________________________________________
Location: Victoria Road, Barnsley S70 2LS
Description: Temporary road closure in operation for the NUM's David Jones/Joe Green Memorial
Lecture. The extent of the closure will be from the junction with Hopwood Street to the
junction with Huddersfield Road, and will be closed from 10.45 am to 11.05 am
Start Date: 13 March 2010
End Date: 13 March 2010
Remarks: Diversion route: Hopwood Street/Western Street/Huddersfield Road
Promoter: NUM, Phil Thompson, telephone: 01226 215555
__________________________________________________________________
Location: Hough Lane, Wombwell - 247 S73 0LL
Description: Sewer repair
Start Date: 29 March 2010
End Date: 06 April 2010
Remarks: 24 hour portable traffic signals
Promoter: Drains Aid - contact Mick Charles tel 07985 810054 email m.charles@drains-aid.com
__________________________________________________________________
Location: Manchester Road, Dodworth (B6099) S75 3JJ
Description: Temporary road closure in operation to carry out essential maintenance works to
railway level crossing. The extent of the closure is 20 metres either side of the level
crossing, and is from 10.30 pm 3 April 2010 to 8.00 am 4 April 2010
Start Date: 03 April 2010
End Date: 04 April 2010
Remarks: Diversion route: Whinby Road/North Road/Barnsley Road/Mitchelson Avenue
Promoter: Centurion Site Services, Noreen Coldwell, telephone: 01924 372957
__________________________________________________________________
Location: Silver Street/Fairway, Dodworth S75 3NP
Description: Temporary full length closure of footpath linking Silver Street and Fairway, for
reconstruction works
Start Date: 20 March 2010
End Date: 17 April 2010
Remarks: Diversion route: Saville Road/Stainborough Road
Promoter: Field and Civil Engineering, Simon Hare, telephone: 01246 419911
__________________________________________________________________
Location: Bank House Lane, Cawthorne - outside Hollyhock Cottage S75 4AP
Description: Pole replacement
Start Date: 19 March 2010
End Date: 19 March 2010
Remarks: Off peak portable traffic signals
Promoter: YEDL Enterprise - contact Gary Dodds tel 07771 974151 email
gary.dodds@enterprise.plc.uk
__________________________________________________________________
Location: Keresforth Road, Gilroyd S75 3NS
Description: Manifold installation shortside
Start Date: 18 March 2010
End Date: 24 March 2010
Remarks: Portable traffic signals during the working day
Promoter: Yorkshire Water H20 Water Services - contact Asad Raza tel 0845 124 2424 email
asad.raza@yorkshirewater.co.uk
__________________________________________________________________
Location: High Street, Monk Bretton S71 2PT
Description: Temporary road closure in operation for telecoms works. The works will be carried out
on two consecutive Sundays on 21 and 28 March 2010. The extent of the closure is
10 metres from junction with roundabout
Start Date: 21 March 2010
End Date: 28 March 2010
Remarks: Diversion route: Cross Street/Burton Road
Promoter: Kcom, Steve Bloomer, telephone: 07545 923647
__________________________________________________________________
Location: St Helen's Way, Monk Bretton S71 2PT
Description: Temporary road closure in operation for telecoms works. The works will be carried out
on two consecutive Sundays on 21 and 28 March 2010. The extent of the closure is
10 metres from junction with roundabout
Start Date: 21 March 2010
End Date: 28 March 2010
Remarks: Diversion route: Fish Dam Lane/King Edward Street/Carnforth Road
Promoter: Kcom, Steve Bloomer, telephone: 07545 923647
__________________________________________________________________
Location: Tennyson Road, Monk Bretton S71 2LW
Description: Temporary road closure in operation for telecoms works. The works will be carried out
on two consecutive Sundays on 21 and 28 March 2010. The extent of the closure is
from the junction with Burton Road to opposite house number 2
Start Date: 21 March 2010
End Date: 28 March 2010
Remarks: Diversion route: Burton Road/Rotherham Road/Warwick Road
Promoter: Kcom, Steve Bloomer, telephone: 07545 923647
__________________________________________________________________
Location: Hill Street and King Street, Elsecar - S74 8EL
Description: Gas removal
Start Date: 11 March 2010
End Date: 31 March 2010
Remarks: 24 hour portable traffic signals
Promoter: M1 Gas Alliance AMEC - contact Mick Kitchen tel 07736 168766 email
mick.kitchen@amec.com
__________________________________________________________________
Location: Pontefract Road, Barnsley - brewery to outside 32
Description: Minor Works
Start Date: 15 March 2010
End Date: 29 March 2010
Remarks: 24 hour portable traffic signals (manually controlled at peak times)
Promoter: M1 Corridor Gas - contact Tony Mitchell tel 0114 232 7300 fax 0114 232 7301
__________________________________________________________________
Location: Barugh Green Road, Barugh Green - opp 114
Description: Repair main (not dowel) < 200mm
Start Date: 10 March 2010
End Date: 15 March 2010
Remarks: Portable trafffic signals during the working day with signals to be manually controlled
during peak time
Promoter: Yorkshire Water H20 Water Services - contact Asad Raza tel 0845 124 2424 email
asad.raza@yorkshirewater.co.uk
__________________________________________________________________
Location: Carlton Road, Royston - junction with Church Street & Royston Lane S71 3JE
Description: Emergency Replacement Work
Start Date: 12 March 2010
End Date: 12 March 2010
Remarks: Portable traffic signals 0930-1530
Promoter: United Utilities Dooceys - contact Adam Farrer tel 07772 343580 fax 01915 014363
__________________________________________________________________
Location: Ballfield Lane, Darton - Darton High School S75 5EJ
Description: SM20 - install large diameter metered S. P.
Start Date: 15 March 2010
End Date: 17 March 2010
Remarks: Portable traffic signals 0930-1530
Promoter: Yorkshire Water H20 Water Services - contact Tim Richardson tel 0845 124 2424
email tim.richardson@yorkshirewater.co.uk
__________________________________________________________________
Location: Highstone Road, Barnsley - Prince of Wales Feathers S70 5ER
Description: Inst Metered MSM Comm Pipe Longside
Start Date: 17 March 2010
End Date: 19 March 2010
Remarks: Portable traffic signals during the working day
Promoter: Yorkshire Water H20 Water Services - contact Asad Raza tel 0845 124 2424 email
asad.raza@yorkshirewater.co.uk
__________________________________________________________________
Location: Shrewsbury Road, Penistone - outside Rose & Crown S36 6DY
Description: Reset Fire Hydrant Cover and Frame
Start Date: 28 March 2010
End Date: 28 March 2010
Remarks: Off Peak 3 way portable traffic signals
Promoter: Yorkshire Water H20 Water Services - contact Paul Garner tel 0845 124 2424 email
paul.garner@yorkshirewater.co.uk
__________________________________________________________________
Location: Whinby Road, Dodworth By Pass S75 4LD
Description: Landscaping
Start Date: 25 March 2010
End Date: 25 March 2010
Remarks: Portable traffic signals during the working day
Promoter: BMBC Landscape Group - contact Sue Rose tel 01226 772559 email
suerose@barnsley.gov.uk